PROJECT DATA
Contract value:  AED 56 million
Contract duration:  26 months
Client:  Landmark Asset Holdings
Consultant:  Archgroup
Main contractor:  Shapoorji Pallonji International FZE
Completion date:  June 2016
This building comprises of 1 U/G basement (storage tanks & plant room), 3 basement floors car parking, ground floor (entrance lobby/DG room/substation/security room), 7 podium car parking, 19 floor offices and 4 roof floors (MEP Plant Rooms).
The total built up area is 1,170,000 sq. ft.
Fire Fighting
    - Fire pump – 1 x diesel pump & electric pump of capacity 1000 GPM @ 18 bar & 1 x  diesel pump & electric pump of capacity 1000 GPM @ 14 bar
 
- RCC fire water tank x 2 of capacity 60,000 US gallons
 
- Sprinkler x 22,000 
 
- Alarm check valve x 4 
 
- 21/2” landing valve with 30m long hose x 200
 
- 1” hose reel with 30m long hose x 200
 
- Deluge valve x 3
 
- 6kg DCP & 5kg CO2 fire extinguisher set x 200
 
- Foam system for generator rooms
 
- Pre-action system for lift machine room
 
- FM 200 gas flooding system x 7 rooms
 
Fire Alarm System
    - Fire alarm control panel x 6
 
- Photo electric smoke detector x 3130
 
- Heat detector x 50
 
- Strobe x 227
 
- Speaker/sounder x 269 
 
Emergency Lighting System
    - Central battery panel x 2
 
- Emergency light x 2455 
 
- Exit light x 807